electric performance of the Toshka Pump Station during the pilot tests for operation:

Date:2007-03-30

Prepared by:Mechanical and Electrical Research Institute

The purpose of the study: to identify the reasons for the inability to operate the plant at full capacity, which is 18 units together and the separation of units after the operation of the unit 16 and the occurrence of a large fluctuation in the voltage leads to the combustion of some equipment and adaptations station Volume and nature of work: Electrical measurements were made on the sources of nutrition for the units